Rochester Active Sports Club (RASC) is a nonprofit club based in Rochester Minnesota, designed to promote nordic skiing, mountain biking and road biking in SE Minnesota.
|
Tasks |
Est hrs/prsn |
2010 |
2011 |
******WINTER****** |
|||
1 Groom |
2/3/2001 |
Done |
|
2 Mark trails with pine boughs/sticks as needed - |
11/25 - BMW |
||
3 Groom QH |
2/3/2001 |
Done |
|
4 Mark trails with pine boughs/sticks as needed - QH |
11/20 - GR |
||
5 Check equipment monthly for repairs - |
0.5/1 |
Replace bolts on tracksetter, repair V800 seat |
|
6 Check equipment monthly for repairs - QH |
0.5/1 |
||
7 Make notes of any areas needing summer work - |
|||
8 Make notes of any areas needing summer work - QH |
|||
9 Note good/bad/missing snow fence placement - |
|||
10 Note good/bad/missing snow fence placement - QH |
|||
11 Late winter add fuel stabilizer to snowmobile - Essex |
0.25/1 |
Done |
|
12 Late winter add fuel stabilizer to snowmobile - QH |
0.25/1 |
Done |
|
13 Take Home' maps - |
Done Repeatedly |
||
14 Take Home' maps - QH |
Done |
||
|
|
|
|
|
|
|
|
******SPRING****** |
|||
15 Move equipment to QH or red barn at |
4-Feb |
Done |
|
16 Take down trail signs at |
Done |
||
17 Take down trail signs at QH |
|||
18 Remove lights - EW |
Done 3/30 |
||
19 *Take down snow fence at |
Done |
||
West Bridge ~75'/side |
Done |
||
East Bridge ~12'/side |
Done |
||
55th St Hill ~150' |
Done |
||
V |
Done |
||
South of 55th St playground ~100' |
Done |
||
Pick up Lathe trail markers |
Done 4/2 |
||
20 Check/repair snow fence along sledding hill - |
needed |
||
21 Check/repair split rail fence - north end QH |
|||
22 *Remove cones at bike path entrances - |
Done 3/12 |
||
By sewer lift station/West bridge |
Done 3/12 |
||
By |
Done 3/12 |
||
|
|
|
|
23 Put up |
Done |
||
24 Change sign boards to Summer trails - |
Done |
||
25 Change sign boards to Summer trails - QH |
|||
26 *Check equipment for repairs* |
|||
27 Skandic 800 Check registration & renew if needed |
Needed |
||
28 Skandic 800 Change oil/grease fittings |
Done |
||
29 Skandic 800 Check track tension and slide wear |
|||
30 Skandic 800 Grease drive shaft (?) |
Done |
||
31 Skandic 800 Put mothballs under seat & hood |
Done |
||
31.5 Skandic V800 - change Trans Fluid |
Done |
||
32 Skandic 550 Check registration & renew if needed |
|||
33 Skandic 550 Grease fittings |
Done |
||
34 Skandic 550 Check track tension and slide wear |
|||
35 Skandic 550 Put mothballs under seat & hood |
Done |
||
|
|
|
|
36 |
|||
37 QH Ginzu |
Needs Mat Repair |
||
38 |
Done |
Ok |
|
39 Red Drag |
Done |
Ok |
|
40 RASC Green Drag |
Painted 11/10 |
Ok |
|
41 Yellow Drag |
Done |
OK, rebuilt & painted 10/2011 |
|
Otter Sleds |
Done |
Ok |
|
EW Green Drag |
Done |
||
Check mower battery for full charge |
Done |
ok - new |
|
|
|
|
|
|
|
|
|
Fertilize trails - |
|||
Fertilize trails - QH |
|||
Overseed trails - |
|||
Overseed trails - QH |
|||
Take Home' maps - |
Done 4/2 |
||
Take Home' maps - QH |
|||
|
|
|
|
|
|
|
|
******SUMMER****** |
|||
Mow trails - |
1-Mar |
Done |
Multiple |
Mow trails - QH |
2/3/2001 |
Done |
Multiple |
Mow trails - EW (time permitting) |
1/2/2001 |
Done |
|
Cut up fallen trees - Essex, QH, & EW |
Done |
done |
|
Trim low branches - Essex, QH, EW |
Done |
done |
|
Work on equipment repair noted in the spring |
done |
||
Work on trail repair/changes noted in winter |
partial - more needed |
||
Start snowmobiles/check for mice |
.5/1 |
Ok |
done |
Order new blades for Ariens mower |
.25/1 |
GR - 10/1 |
|
Mid-summer - change mower blades, grease fittings, etc |
1-Jan |
GR - 8/21 |
|
Fertilize trails - 2nd round - |
missed |
||
Fertilize trails - 2nd round - QH |
missed |
||
Take Home' maps - |
done |
||
Take Home' maps - QH |
|||
|
|
|
|
|
|
|
|
******FALL****** |
|||
Clean summer dust off equipment |
Done |
done |
|
Mow trails wider & trim veg for winter - |
Done |
done |
|
Mow trails wider & trim veg for winter - QH |
Done |
done |
|
Mow trails wider & trim veg for winter - EW |
Done |
done |
|
Fertilize trails - 3rd round - |
BW - 9/13 |
||
Fertilize trails - 3rd round - QH |
~9/20 |
missed |
|
Put up trail signs - |
BW - 11/21 |
done |
|
Put up trail signs - QH (as needed) |
Done |
||
Check/move benches - QH ballfields |
Done |
||
Put up snow fence QH Bridge |
Skipping |
skip |
|
*Put up snow fence - |
done |
||
West Bridge ~75'/side |
done |
done |
|
East Bridge ~12'/side |
done |
||
55th St Hill ~150' |
done |
done |
|
V |
done |
done |
|
South of 55th St playground ~100' |
done |
done |
|
Caretakers house |
done |
||
|
|
|
|
Check/repair snow fence along sledding hill - |
done |
done |
|
*Put out cones at bike path entrances - |
|||
By sewer lift station/West bridge |
|||
By |
done |
||
|
|
|
|
Put up |
done |
||
Change sign boards to winter trails - |
done |
done |
|
Change sign boards to winter trails - QH |
done |
||
Grease actuators on Ginzu's (2 per) |
done |
||
*Check snowmobile kits* |
0.5/1 |
||
Skandic 800 Flashlight & Batteries |
Done |
||
Skandic 800 shovel |
Done |
||
Skandic 800 rope |
Done |
||
Skandic 800 spare belt |
Done |
||
Skandic 800 hitch pins |
|||
Skandic 800 spare fuses |
|||
|
|
|
|
Skandic 550 Flashlight & Batteries |
Done |
||
Skandic 550 shovel |
In Shed |
||
Skandic 550 rope |
Done |
||
Skandic 550 spare belt |
Done |
||
Skandic 550 hitch pins |
|||
Skandic 550 spare fuses |
|||
|
|
|
|
Change Skandic 550 drive belt - yearly |
done |
||
Change Skandic 800 drive belt -even years |
done |
||
Skandic 800 grease drive shaft |
done |
||
Move equipment to winter locations |
done |
||
*Mower* |
1-Feb |
||
Clean |
Done |
||
Grease deck and axle's |
|||
Change Oil |
Done |
||
Sharpen Blades |
Done |
||
Check air/fuel filters |
Done |
||
Put Mothballs in engine/seat area |
Done |
||
Add Fuel Stabilizer |
Done |
||
Install lights at Eastwood |
Done |
done |
|
|
|
|
|
Take Home' maps - |
Done |
done |
|
Take Home' maps - QH |
Done |